Roads paved in this manner are expected to last in excess of 40 years and should not experience distress such as potholes which are commonly seen after frequent rainfall events. RCC roads are expected to be longer lasting, more durable and climate friendly.
Ongoing Works | Status |
---|---|
Cottage Vale, St. Philip | Cadastral Surveys |
Gibbons Terrace, Christ Church | Completed |
Gilkes Road, St. Michael | Completed |
Millionaire Road, St. Peter | Completed |
Sweet Home Road, St. Peter | On hold |
Skeete's Road, Jackmans, St. Michael | Completed (Phase 1) |
Sunrise Crescent Off Long Bay, St. Philip | Completed |
Temporary address:
2nd Floor
The Goddard Building
Haggatt Hall
St. Michael
Bridgetown, Barbados
PBX: 246-536-0000
psmtwm@barbados.gov.bb
information.unit@publicworks.gov.bb
Copyright © 2024 Ministry of Transport and Works | Barbados