NOTICES

c Expand All C Collapse All
Category: GEED

The length of time to conduct an inspection depends on the size of the building. However, inspections usually range from an hour to three hours. 

Category: GEED

The waiting period is three business days.

Category: GEED

The waiting period is generally 2 weeks.

Category: GEED

Inspection fees are paid at the Ministry of Transport and Works, Pine East-West Boulevard, The Pine, St. Michael.

Category: GEED

Domestic/Resident inspection is $3.00 (basic fee), plus 0.25c per point
Commercial inspection is $25.00 (basic fee), plus 0.50c per point

Category: GEED

Application forms are available at https://forms.gov.bb/Electrical_Installation_Application Forms can also be collected from our office in Verona House, Bank Hall, St. Michael. Please note that the application can only be facilitated by a licensed electrician. 

Category: GEED

No, only a licensed electrician is allowed to submit an application form.

Category: GEED

No, only the licensed electrician who applied can collect the certificate.