Scotland District Road Rehabilitation Project

Under this project, aging and deteriorating highways, roads, culverts and bridges that are mainly affected by landslides in the Scotland District of Barbados will be rehabilitated or reconstructed.

The Scotland District is unique as it is the highest peak of a massive Caribbean underwater mountain range which stretches from Trinidad to Puerto Rico. The area is said to have the shape of a half-bowl. The Scotland District touches seven parishes on the island: parts of St. Lucy, St. Peter, St. James, St. Joseph, St. Thomas and St. John, however, the parish of St. Andrew sits completely within the Scotland District. The soil composition and topography within the Scotland District comprise mostly chalk and clays, making the area extremely vulnerable to landslides especially after rainfall.

The Scotland District Road Rehabilitation Project is funded by the Export-Import Bank of China to the sum of Bds$230 million. The contractor, China National Complete Plant Import and Export Corporation Ltd (COMPLANT), executes the work in collaboration with local construction firms, artisans and engineers. The Ministry has procured the services of Design Collaborative in association with Professional Engineering Services Limited to carry out project management and engineering services.

ROADS

The following roads have been commenced or completed in 2023/2024
RoadsStatusNotes
Animal Flower Cave, St. LucyOngoingRoad is being final graded before paving. Length of road - 540
Babylon Road BridgeTo commence
Babylon Road, St. AndrewOngoing Slipper and kerb cast on both sides of the road. Length of road - 1
BathshebaTo commence
Belleplaine Road to St. Andrew ChurchTo commence
Bloomsbury, St. ThomasTo commence
Bruce Vale Bridge
Bruce Vale Bridge, St. AndrewOngoing
Chance Hill, St. LucyOngoingConstruction of reinforced concrete box-drains. Lenght of road 531 m
Coggins Hill, St. AndrewOngoing
Ermy Bourne HighwayTo commenceDesigns to be completed
Four HillTo commenceDesigns to be completed
French Village/Mount Brevitor, St. PeterTo commenceDesigns to be completed
Glenburnie, St. JohnOngoing
Hangman HillTo commenceDesigns to be completed
Highway 1CTo commenceDesigns to be completed
Highway 3 – St. Elizabeth Village to Horse HillTo completed
Highway B2
Highway F – Andromeda to Coach HillOngoingCasting concrete box-drain. Length of road 2.3 km
Highway Z – St. Elizabeth Village to Andromeda Gardens via Bathsheba
Indian Ground Road
Jemmotts Road to Change Hill, St. LucyOngoing
Jemmotts Road to Mount View Road, St. Lucy
Kings Street, St. AndrewOngoing
Laynes Bridge (Highway 3A – Sugar Hill to Highway 3)
Link Rd. Four Hill to Junction Prospect and Indian Ground Rd
Mission Bottom Bridge
Mose Bottom
Prospect Road
Reece Road, St. Thomas
Sailor Gully/Orange Hill
Shorey Village Road, St. AndrewCompleted
St. Simons, St. Andrew
Tent Bay
Trio Path Bridge
Vaughn’s Road No. 2, St. JosephOngoing
White Hill, St. AndrewOngoing