NOTICES

ROAD WORKS ACTIVITIES FOR NOVEMBER 18-22, 2024

Footpath construction in Belleplaine, St Andrew by the team from the Haggatts Depot.

Road Marking 

The road marking crews of the Ministry of Transport and Works (MTW) will repaint the roundabouts in Welches Heights and Redman’s Village, St. Thomas along Highway 2A. Reflective road studs (cat eyes) will also be installed from the St. Thomas Parish Church roundabout heading north, and on Pine East-West Boulevard, St. Michael. Stop lines and pedestrian crossings will be remarked in Deacons, St. Michael and Country View, St. Philip.

Motorists are urged to avoid speeding through work areas while road markings are being done as this endangers the lives of workers and damages the freshly painted road markings.

Road Rehabilitation/ Road Construction

  • Babylon Road, St. Andrew – box drains and kerb & slipper construction
  • Bridgefield, St. Thomas – BWA works & design ongoing
  • Chance Hill, St. Lucy – box drain construction
  • Cherry Tree Hill, St. Andrew – preparations for road construction
  • Coggins Hill, St. Andrew – restricted access
  • Cottage Vale, St. Philip – cadastral surveys ongoing
  • Glenburnie, St. John – box drain & road base construction
  • Hangman’s Hill, St. Thomas – road preparation for use as a bypass road
  • Highway F, Bath, St. John – road base construction; road closed
  • Jemmotts Road, St. Lucy – BWA works ongoing
  • Jericho to Middleton, St. George – milling
  • King’s Street, St. Andrew –gabion works
  • Laynes Bridge, St. Joseph – gabion works and culvert construction
  • Mellows, St. Joseph – extensive pothole patching
  • Millionaire Road, St. Peter – accommodation works
  • Prior Park, St. James – wells and kerb construction; single lane traffic
  • Reece Road, St. Thomas – masonry work, suck well & box drain excavation
  • Rock Dundo, St. James to Gibbs, St. Peter –kerb construction
  • St. Simons, St. Andrew – box drain continue
  • Sweet Home Road, St. Peter –on hold temporarily
  • Wakefield, St. John – paving
  • White Hill Phase 2, St. Andrew – road and drainage construction

Drainage Cleaning

  • 19 South Point, Atlantic Shores, Ch. Ch.
  • Dayrells Road, Ch. Ch.
  • Drain behind David’s auction
  • Fairfield Cross Road between Seclusion Road and Belfield
  • Goodland drain into Knights Land
  • Maxwell Main Road, Ch. Ch. (continuing)
  • Pine East West, St. Michael (continuing)
  • Reece Road, #2 Brittons Hill, St. Michael
  • Rockley New Road, Ch. Ch.
  • Ruby Main Road, St. Philip
  • Solo drain, Black Rock, St. Michael
  • Trevor’s Way, Bridgetown (continuing)

Highway Beautification Programme (Debushing)

  • Gibbs Road, Highway 1 to Rock Dundo, Ronald Mapp Highway, St. James
  • Harmony Hall, Station Hill, Waterford, Hothersal Turning, Lower Estate, St. Michael
  • Highway 3 Parris Hill to St Elizabeth, St. Joseph
  • Highway 7 from Rendezous Road to Tom Adams Roundabout, Christ Church
  • Highway M from Sterling to Parish Land, St. Philip
  • Highway Q, Newton to Windsor, Christ Church
  • Mount Brevitor via French Village to Indian Ground, St. Peter
  • River Road, Highway 6: Lower and Upper Collymore Rock, Wildey Road, St. Michael

Ongoing road works

St. Michael – Phase 1 of the construction of a slipper and kerb and a new footpath at Long Gap is near completion, and work has commenced on Phase 2. Work is on hold at King William Street and at Lightfoot Lane in The City. The footpath at Golden Rock is finished. Compromised footpaths are being repaired along Pine East West Boulevard. Pothole patching is scheduled for districts.

St. John – Wakefield Road is scheduled to be paved. Masonry works are ongoing at Malvern. De-bushing is scheduled throughout the parish.

St. Philip –  Construction of a bounce-up continues in Atlantic Park. In Ruby Tenantry, the construction of the slipper and kerb also continues. Ruby Plantation Road will be graded and marl filled. De-bushing is scheduled for Rices and Kirtons while weeding is scheduled for Fortesque. Pothole patching will be done in Rock Hall and throughout the parish.

St. George – Work continues on the short roads in Constant Tenantry and Daniel’s Land under the Community Access Road Transformation (CART) Project. Kerb construction is ongoing in Rock Hall. Drainage work will be carried out along Ellerton Main Road. Pothole patching is due for Oldworks Hill, Salters and Walkers. Weeding and de-bushing are scheduled for Highway 3B, Market Hill, Bridgecot South, Lower Newbury and Workmans.

Christ Church – Concrete works are scheduled for Gibbons Terrace, Inch Marlow, and Sheraton Park. Drainage work is being carried out at Pegwell Boggs, Seascape Drive, and Inch Marlow. Pothole patching is scheduled for Kingsland, Breedy Land, Parish Land, Coral Ridge and Edey Village. Debushing is scheduled for St. Davids/Bannatyne, Gibbons Boggs, and Lower Carters Gap. Due to road depressions at Sayers Court, motorists, especially drivers of heavy-duty vehicles, are urged to be cautious while travelling around the small roundabout.

St. Joseph/St. Andrew – Road repairs are to commence at Spa Hill. Persons are reminded not to drive on Swanns Bridge which has been closed due to deterioration. Handrails are to be installed at Swanns. Gabion work is to commence in St. Elizabeth. The road at Trio Path is being reinstated and preparations are being made for paving. Manual and mechanical de-bushing continues from Lower Parks Road to Dark Hol, Fruitful Hill, Cox Hill to Gaggs Hill, the junction of Turner’s Hall to Swanns to Rock Hall, Sailor Gully to Indian Ground to Welchtown, The Ridge to Springfield. Pothole patching will take place from Cherry Tree Hill to Morgan Lewis Windmill.

St. Lucy – Work continues on Pie Corner Bridge; the road is closed until further notice. Motorists may divert at Well Road; local access will be granted. Work on Well Road No. 2 is soon to be completed under the C.A.R.T Programme. Pot-hole patching will be done throughout districts.

St. Peter – Debushing at Mount Brevitor via French Village to Indian Ground. Pothole patching is being done throughout the parish. Farm Bridge remains closed until further notice; access to the Ronald Mapp Highway from Speightstown, and vice versa, is through Warleigh Road. 

St. James – Manhole covers are being repaired along Highway 1 in  Porters and Holetown. Drainage work is scheduled for Hoytes Village. A headwall is being constructed in Durants. Pothole patching is scheduled throughout the districts.

St. Thomas – Preparations are being made for paving in Stoney Gully. Pothole patching and de-bushing are schedule throughout districts.

MTW advises pedestrians and motorists to obey traffic wardens, pay attention to signage, and exercise due care and attention when traversing work sites.