Road works activities for April 14-18, 2025

Road Marking 

The Ministry of Transport and Works (MTW) road marking crew will paint pedestrian crossings on Highway 7 in two phases: 1. from the bottom of Rendezvous Hill to Top Rock, and 2. from Top Rock Roundabout to Oistins. Work will be done Monday to Thursday between 6:00 p.m. and 4:00 a.m., weather permitting.

Motorists are urged to avoid speeding through work areas while road markings are being done as this endangers the lives of workers and damages the freshly painted road markings.

Road Rehabilitation/ Road Construction

  • Airy Hill, St. Joseph – road repairs, realignment and gabion work (road closed)
  • Bruce Vale Bridge – bridge demolition completed; surveying & gabion works
  • Chance Hill, St. Lucy – drainage construction 
  • Cottage Vale, St. Philip – roller compacted concrete (RCC)
  • D’Arcy Scott Roundabout to Welches Roundabout, St. Michael – milling & paving
  • Eckstein Village, St. Michael –  accommodation works
  • Grant’s Gap, Westbury Road, St. Michael – milling & paving
  • Highway B2/Cherry Tree Hill, St. Andrew – (road closed) gabion repair
  • Highway D: Content to Dukes, St. Thomas – road reconstruction; section closed
  • Hangman Hill to Bridgefield, St. Thomas – road reconstruction; section closed
  • Phase 1: Highway F, St. John – paving
  • Huntes Road, Carrington Village, St. Michael – milling & paving
  • King’s Street, St. Andrew – gabion and rip rap construction 
  • Laynes Bridge, St. Joseph – gabion construction
  • Mose Bottom, St. Andrew – retaining wall and drainage construction
  • Park Road – 1st, 2nd, 3rd Avenues, St. Michael – concrete works, milling & paving
  • Prior Park, St. James – road reconstruction (excavation)
  • Reece Road, St. Thomas – kerb and drainage construction
  • St. Elizabeth’s Village, St. Joseph – paving, gabion construction, road repairs
  • St. Margaret’s, St. John – excavation of BWA trenches
  • Sunflower Drive, Cane Garden, St. Michael – milling & paving
  • Wanstead Heights Main Road, St Michael
  • White Hill Phase 2, St. Andrew – gabion construction
  • Wildey Triange, St. Michael – milling & paving
  • Yearwood Road, St.  Joseph –  milling & paving

Drain Cleaning

  • Ashby Ave, Oistins, Christ Church
  • Durants Corner, Christ Church
  • Elizabeth Park, Christ Church
  • James Street, Bridgetown
  • Lower Broad Street, Bridgetown
  • Rhianna Drive, St. Michael
  • Small Land, Bridge Gap, Black Rock, St. Michael
  • Todd’s Corner to Melvins Hill, St. Joseph
Kerb construction along Babylon Road, St Andrew in Barbados

Ongoing road works

St. Michael – The construction of the slipper and kerb at Sargeants Village is almost done, and clean-up work is scheduled to begin. Repairs are ongoing to slipper and kerb at Tweedside Road; the area has been excavated and formwork installed. Concrete works are ongoing to a manhole at the Waterford roundabout near the Combermere School. Manhole repairs also continue on Constitution Road, and at the traffic lights adjoining Roebuck Street and Crumpton Street. Reconstruction of the footpath at Bridge Road is in the final stage, with formwork erected, steel work and concrete will be put in place next. Pothole patching is underway throughout the district.

Christ Church – Repairs continue to a broken culvert at the Accra Taxi stand, while repairs to a footpath and manhole cover installation are ongoing on Maxwell Main Road. Kerb construction and resurfacing are underway in Gibbons Terrace. Drainage work will be done in Welches, St. Lawrence Gap, Hopewell and Wilcox. Pothole patching is scheduled for Warners Main Road, Briar Hall, Leadvale, Wilcox, Long Beach, Pilgrim Road, Plumfgrove, Elizabeth Park, Coral Ridge, Charnocks, Graeme Hall, Fairview and Inch Marlow.

St. George – Manhole restoration continues in Jordans. Restoration work will be done to a retaining wall on Valley Main Road; preparations for road surfacing will also be carried out on Valley Main Road. Weeding will be done in Sweet Vale, while debushing will be done along Cottage Main Road. Drainage work will continue on Price Road. Cold mix patching will be done in Walkers and Woodland Bottom.

St. Lucy – Repairs to a footpath continue in Bourbon Road, while slipper and kerb repairs are ongoing in Free Hill and Mount View. Drainage work will be done in Half Moon Fort and Bourbon Road. Debushing will be carried out in Lamberts, while pothole patching is scheduled for Rockfield, Spring Garden and Hope Road.

St. Peter – Repairs continue to the slipper and kerb on Maynards Retreat Road. Farm Bridge remains closed until further notice; access to the Ronald Mapp Highway from Speightstown, and vice versa, is through Warleigh Road. 

St. James – Repairs are ongoing to manhole covers along Highway 1 in front of the Royal Pavilion Hotel, while cleaning of road stuff will be done from Porters to Lower Carlton. Footpath repairs are scheduled for Porters, and bollards will be installed in Oxnards.

St. John – Masonry works continue in Small Town. Weeding will be carried out on Society Hill and debushing in Palmer, Wakefield and Supers. Pothole patching will be carried out throughout the parish.

St. Philip – Construction of a bounce-up and slipper and kerb continues in Atlantic Park. The reconstruction of a haunch and the slipper and kerb is ongoing at Farm Road. Manual weeding will be done in Ruby Development and debushing along Ruby Main Road.

St. Thomas – Construction of a connecting footpath and retaining wall at Stoney Gully continues; plastering is due for the wall next week. Debushing, drainage work, and pothole patching are scheduled throughout districts.

St. Joseph/St. Andrew – Construction of slipper and kerb continues in Jackmans Alley, Orange Hill. Preparations for paving the roadway at Swanns have started. Routine maintenance is underway in St. Joseph with plans to enhance the area around Bathsheba Park. Pothole patching, drain cleaning and debushing are slated for both parishes. Persons are reminded not to drive on Swanns Bridge which has been closed due to deterioration.