As of April 1, 2024, all temporary supply connections that have been in existence for more than five (5) years without a reasonable explanation shall be terminated. Construction works relating to such installations should have been completed within this time. This would have allowed for the structure to be wired, inspected, and certified.
Temporary address:
2nd Floor
The Goddard Building
Haggatt Hall
St. Michael
Bridgetown, Barbados
PBX: 246-536-0000
psmtwm@barbados.gov.bb
information.unit@publicworks.gov.bb
Copyright © 2024 Ministry of Transport and Works | Barbados