The Scotland District Road Rehabilitation Project is funded by the Export-Import Bank of China to the sum of Bds$230 million. The contractor, China National Complete Plant Import and Export Corporation Ltd (COMPLANT), executes the work in collaboration with local construction firms, artisans and engineers. The Ministry has procured the services of Design Collaborative in association with Professional Engineering Services Limited to carry out project management and engineering services.
Roads | Status | Notes |
---|---|---|
Animal Flower Cave, St. Lucy | ||
Babylon Road Bridge | ||
Babylon Road, St. Andrew | ||
Bathsheba | ||
Belleplaine Road to St. Andrew Church | ||
Bloomsbury, St. Thomas | ||
Bruce Vale Bridge | ||
Bruce Vale Bridge, St. Andrew | Ongoing | |
Chance Hill, St. Lucy | ||
Coggins Hill, St. Andrew | Ongoing | |
Ermy Bourne Highway | ||
Four Hill | ||
French Village/Mount Brevitor, St. Peter | ||
Glenburnie, St. John | Ongoing | |
Hangman Hill | ||
Highway 1C | ||
Highway 3 – St. Elizabeth Village to Horse Hill | ||
Highway B2 | ||
Highway F – Andromeda to Coach Hill | ||
Highway Z – St. Elizabeth Village to Andromeda Gardens via Bathsheba | ||
Indian Ground Road | ||
Jemmotts Road to Change Hill, St. Lucy | Ongoing | |
Jemmotts Road to Mount View Road, St. Lucy | ||
Kings Street, St. Andrew | Ongoing | |
Laynes Bridge (Highway 3A – Sugar Hill to Highway 3) | ||
Link Rd. Four Hill to Junction Prospect and Indian Ground Rd | ||
Mission Bottom Bridge | ||
Mose Bottom | ||
Prospect Road | ||
Reece Road, St. Thomas | ||
Sailor Gully/Orange Hill | ||
Shorey Village Road, St. Andrew | Completed | |
St. Simons, St. Andrew | ||
Tent Bay | ||
Trio Path Bridge | ||
Vaughn’s Road No. 2, St. Joseph | Ongoing | |
White Hill, St. Andrew | Ongoing |
Temporary address:
2nd Floor
The Goddard Building
Haggatt Hall
St. Michael
Bridgetown, Barbados
PBX: 246-536-0000
psmtwm@barbados.gov.bb
information.unit@publicworks.gov.bb
Copyright © 2024 Ministry of Transport and Works | Barbados