ROAD WORKS ACTIVITIES FOR April 7 – 11, 2025

Road Marking

The Ministry of Transport and Works (MTW) road marking crew will continue remarking Princess Alice Highway; Fontabelle in The City; and the highway between the Errol Barrow Roundabout and the Top Rock Roundabout (Graeme Hall). Work will be done Monday to Thursday between 6:00 p.m. and 4:00 a.m., weather permitting.

Motorists are urged to avoid speeding through work areas while road markings are being done as this endangers the lives of workers and damages the freshly painted road markings.

Road Rehabilitation/ Road Construction

  • Airy Hill, St. Joseph – road repairs, realignment and gabion work (road closed)
  • Bruce Vale Bridge – bridge demolition completed; surveying & gabion works
  • Chance Hill, St. Lucy – drainage construction 
  • Cottage Vale, St. Philip – preparing for roller compacted concrete (RCC)
  • D’Arcy Scott Roundabout to Welches Roundabout, St. Michael – milling & paving
  • Eckstein Village, St. Michael –  accommodation works
  • Grant’s Gap, Westbury Road, St. Michael – milling & paving
  • Highway B2/Cherry Tree Hill, St. Andrew – (road closed) gabion repair
  • Highway D: Content to Dukes, St. Thomas – road reconstruction
  • Hangman Hill to Bridgefield, St. Thomas – road reconstruction; section closed
  • Phase 1: Highway F, St. John – drainage and retaining wall construction
  • Huntes Road, Carrington Village, St. Michael – milling & paving
  • King’s Street, St. Andrew – gabion and rip rap construction 
  • Laynes Bridge, St. Joseph – gabion construction
  • Link Road, Four Hill, St Peter – drainage construction
  • Mose Bottom, St. Andrew – retaining wall and drainage construction
  • Park Road – 1st, 2nd, 3rd Avenues, St. Michael – concrete works, milling & paving
  • Prior Park, St. James – road reconstruction (excavation)
  • Reece Road, St. Thomas – kerb and drainage construction
  • St. Elizabeth’s Village, St. Joseph – gabion construction, road repairs
  • St. Margaret’s, St. John – excavation of BWA trenches
  • Sunflower Drive, Cane Garden, St. Michael – milling & paving
  • White Hill Phase 2, St. Andrew – gabion construction
  • Wildey Triange, St. Michael – milling & paving
  • Yearwood Road, St.  Joseph –  milling & paving

Drain Cleaning

  • ABC Highway from Kendal Hill to the Airport Roundabout 
  • Bora Bora, Paynes Bay, St. James
  • Coral Cresent, Long Bay Development, St. Philip
  • 1st Avenue Crystal Cresent, Kingsland, Christ Church
  • Dayrells Road, St. Michael
  • James Street, Bridgetown
  • 1st Avenue Promenade Road, St. Michael
  • Rockley New Road, Christ Church (in progress)
  • Ruby Park, St. Philip 
  • Small Land, Bridge Gap, Black Rock, St. Michael
  • Todd’s Corner to Melvins Hill, St. Joseph 
  • Trident House, Bridgetown 

Ongoing road works

St. Michael – The construction of the slipper and kerb continues at Sargeants Village to channel the flow of water. The concrete work in the slipper has been completed and work on the kerb is in progress. Manhole repairs continue at the traffic lights adjoining Roebuck Street and Crumpton Street; excavation is finished, and masonry work continues. 90% of the footpath at Bridge Road has been excavated. The 2nd area has been cast and some additional excavation is being done. Pothole patching is underway throughout the district.

Christ Church – Repairs have commenced to a broken culvert at the Accra Taxi stand, the area was excavated and the concrete has been poured. Kerb construction and resurfacing are underway in Gibbons Terrace. Drainage work will be done on Maxwell Main Road, Ealing Park and Oistins. Repairs will also be done to a grill on the footpath on Maxwell Main Road and in Church Hill. Debushing will take place in Hopewell, Silver Sands and Wilcox. Pothole patching is scheduled for Kingsland, Gibbons Main Road, Leadvale, Wilcox, Chancery Lane, Plumgrove, Inch Marlow, Warners, Charnocks, Graeme Hall and Atlantic Shores.

St. George – Masonry work will continue at Jordan’s Main Road. Weeding will be done in Sweet Vale while mechanical debushing will be carried out along Paradise Main Road. Drainage works will be done at Price Road. Pothole patching is scheduled for Valley Main

Road, Walkers and throughout the districts.

St. Lucy – Repairs to a concrete footpath in Bourbon continue while slipper and kerb repairs in Free Hill have commenced. Concrete drains in Shemans will be cleaned. Pothole patching will be carried out throughout the districts.

St. Peter – Repairs to slipper and kerb and preparation for pothole patching in Maynards Retreat Road continue. Farm Bridge remains closed until further notice; access to the Ronald Mapp Highway from Speightstown, and vice versa, is through Warleigh Road. 

St. James – Repairs are ongoing to manhole covers along Highway 1 in The Garden. Footpath repairs are scheduled for Porters, and bollards will be installed in Oxnards.

St. Philip – Construction of a bounce-up and slipper and kerb continues in Atlantic Park. The reconstruction of the slipper and kerb is ongoing at Farm Road and Ruby Tenantry Road. Manhole reconstruction will be carried out at Industry Hall. Debushing will be carried out at Cox Hill to Chapel and Duncans. Kerb layout to be done at Stroude Land.

St. John – Masonry works will be done at Small Town. Weeding will be carried out in Society and debushing in Haynes Hill and Hothersal. Pothole patching will be carried out throughout the parish.

St. Thomas – Construction of a connecting footpath and retaining wall at Stoney Gully continues; concrete will be poured. Debushing, drainage work, and pothole patching are scheduled throughout districts.

St. Joseph/St. Andrew – Construction of slipper and kerb continues in Jackmans Alley, Orange Hill. In Shorey Village, a drive entrance is being constructed. Preparations for paving are scheduled for Swanns. Pothole patching, drain cleaning and debushing are slated for both parishes. Persons are reminded not to drive on Swanns Bridge which has been closed due to deterioration.