Road Marking
The Road Marking crew of the Ministry of Transport and Works (MTW) will continue remarking pedestrian crossings for the new school year in Christ Church, St. Michael, St. George and St. James this week. Work will be done Monday to Thursday, between 6:00 p.m. and 4:00 a.m., weather permitting.
Motorists are urged to avoid speeding through work areas while road markings are being done, as this endangers the lives of workers and damages the freshly painted road markings.
Road Rehabilitation/ Road Construction
- 1st and 2nd Ave, Rouen Road, My Lords Hill, St Michael – road rehabilitation
- 3rd Ave, Goodland, St. Michael – road rehabilitation
- Airy Hill, St. Joseph – culvert construction
- Babylon Road, St. Andrew – drainage & road construction
- Bruce Vale Bridge – constructing the bridge foundation
- Coggins Hill, St. Andrew – retaining wall, culvert & drainage construction
- Cottage Vale, St. Philip – roller compacted concrete (RCC)
- Dacosta Drive, Eden Lodge, St. Michael – road rehabilitation
- Glenburine Road, St. John – gabion construction
- Gays, St. Peter – milling and paving
- Hangman Hill to Bridgefield, St. Thomas – road reconstruction; section closed
- Highway 1C/Hope Road, St. Lucy – road reconstruction
- Highway B2, St. Andrew – drainage & gabion construction
- Highway C, St. James – road rehabilitation
- Highway D, Content to Dukes, St. Thomas – road reconstruction
- Highway F Phase 1, St. John – paving & road construction
- Hunte Road, Carrington Village, St. Michael – paving
- King’s Street, St. Andrew – gabion foundation backfilling
- Laynes Bridge, St. Joseph – culvert construction
- Lodge Hill, St. Michael – road rehabilitation
- Mose Bottom, St. Andrew – road and drainage construction
- Mount Brevitor, St. Peter – road rehabilitation (sidewalks and slipper, and kerb)
- Prior Park, St. James – road reconstruction
- Sorrel Lane, Eden Lodge, St. Michael – road rehabilitation
- St. Margaret’s, St. John – kerb and culvert construction
- White Hill Phase 2, St. Andrew – accommodation works
Drain Cleaning
- Charles Row Bridge, St. George
- Holetown, St. James
- JTC Ramsey Roundabout, Haggatt Hall, St. Michael
- Long Pond, St. Andrew
- Murphy Pasture, St. Michael
- Round-the-Town, St. Peter
- Salt Pond, Speightstown, St. Peter

Ongoing road works
St. Michael – Repairs to a culvert in Whitepark Road has commenced. In Grazettes, in the vicinity of the primary school, concrete bollards are being installed. The construction of the slipper and kerb in Clapham is on hold.
Christ Church – Construction of the footpath in Dayrells Hill (Lower Greys) continues. Drainage and debushing are planned for Inch Marlow and Welches. Pothole patching is scheduled for Silver Hill, Parish Land, Plumgrove, Kendal Hill Park, Gibbons, Chancery Lane, Bannantyne, Staple Grove and Maxwell Plains.
St. George – Weeding is scheduled in Roach Village, while debushing is planned at Boarded Hall. Drainage work will be carried out in Lower Estate. Masonry work, which includes kerb construction and accommodation, is scheduled for Superlative. Pothole patching will be done in Old Works Hill and from Love Rock Corner towards Eastlynne Hill.
St. Philip – Manhole repairs are being carried out in Halton Main Road, while slipper and kerb reconstruction are ongoing in Johnson Development. Slipper reconstruction is ongoing in Foursquare Valley. Slipper and kerb cleaning is scheduled around Six Road Hub. Weeding will be done in Ruby Development, while mechanical debushing will be done in Fortesque. Bus stop and sign replacement will be carried out in districts. Pothole patching is scheduled throughout the parish.
St. Lucy – The construction of a headwall continues in Josey Hill. Drain and well cleaning will be carried out in Checker Hall Development. Debushing will also be carried out in Date Tree Hill. Pothole patching is scheduled throughout the districts.
St. Peter – Debushing is being done along the K.N.R. Husbands Highway. Work continues on the box drain and slipper and kerb along Maynards Retreat Road. Pothole patching is scheduled for Castle, The Rock, Sailor Gully, and Indian Ground to Roebuck. Farm Bridge remains closed until further notice. Access to the Ronald Mapp Highway from Speightstown, and vice versa, is through Warleigh Road.
St. Thomas –The footpath and retaining wall at Stoney Gully are done, and preparation for paving has started. Pothole patching, drain cleaning and debushing throughout the district.
St. James – Debushing is scheduled for Lancaster. Repairs are ongoing on two box drains in Porters Road. Excavation works are planned for slipper and kerb construction near the Archives Department. Pothole patching is scheduled for Mullins Road, Sea View Road, Highway 1A, and West Terrace.
St. John – Masonry works are continuing in Consett and Coach Hill. Weeding will be carried out in Bath Land. Pothole patching is scheduled for Supers, Colleton, Sargeant Street, Welch, and Pothouse.
St. Joseph/St. Andrew – Following the closure of Melvin Hill Bridge, Springfield to Newton Crescent is being debushed, trees are being trimmed and resurfacing is also being done to facilitate the use of this road as a bypass road. The construction of a spirolyte pipe culvert is also being done. Motorists and public transportation can use this route during the closure of the bridge. Bridge poles are being erected in Lakes and Haggatts. Mechanical debushing and cleaning of outfall drains are also taking place in Bawdens. Construction of the slipper and kerb in Lakes Village continues. Road construction is ongoing at Swanns. Debushing, patching, extensive pothole patching, and drainage work are scheduled throughout the parishes. Persons are reminded not to drive on Swanns Bridge, which has been closed due to deterioration.