Road Marking
TThe road marking crew of the Ministry of Transport and Works (MTW) will repaint road markings on The Wynter Crawford Circle (Six Roads Roundabout) in St. Philip
The crew will paint each lane separately. As each leg is remarked, that section of road will be closed to traffic. Detours will be put in place to guide motorists accordingly. Work will be done Monday to Thursday between 3:00 p.m. and 11:00 p.m., weather permitting.
Motorists are urged to avoid speeding through work areas while road markings are being done as this endangers the lives of workers and damages the freshly painted road markings.
Road Rehabilitation/ Road Construction
- Animal Flower Cave Road, St. Lucy – drainage works
- Babylon Road, St. Andrew – Lego retaining wall, kerb and drainage construction
- Bruce Vale Bridge – bridge demolition completed; gabion works
- Chance Hill, St. Lucy – drainage construction
- Chelston Avenue, St. Michael – kerb construction
- Coggins Hill, St. Andrew – Slipper and kerb & drainage construction
- Cottage Vale, St. Philip – excavation
- Eden Lodge Avenue, St. Michael – concrete works, milling and paving
- Errol Barrow Roundabout to Top Rock Roundabout – milling and paving
- Glenburnie, St. John – base course construction
- Grant’s Gap, Westbury Road, St. Michael – milling and paving
- Highway B2/Cherry Tree Hill, St. Andrew – (road closed) gabion repair
- Highway D, Content to Dukes, St. Thomas– road reconstruction (excavation)
- Highway F (Phase 1), St. John – drainage and retaining wall construction
- Huntes Road, Carrington Village, St. Michael – milling and paving
- Jemmotts Road, St. Lucy – road base and culvert construction
- King’s Street, St. Andrew – gabion and rip rap construction
- Laynes Bridge, St. Joseph – gabion construction
- Link Road & Four Hill, St Peter –drainage construction
- Mose Bottom, St. Andrew – retaining wall and drainage construction
- 3rd and 10th Avenue, New Orleans, St, Michael – milling and paving
- Park Road – 1st, 2nd, 3rd Avenues, St. Michael – concrete works, milling & paving
- Prior Park, St. James – excavation
- Reece Road, St. Thomas – kerb and drainage construction
- Rock Dundo, St. James to Gibbs, St. Peter – kerb construction
- St. Elizabeth’s Village – gabion construction
- St. Margaret’s – excavation of BWA trenches
- Villa Road, Brittons Hill, St Michael – milling and paving
- White Hill Phase 2, St. Andrew – gabion construction
Drain Cleaning
- Advent Ave, Bank Hall, St. Michael
- Ashdeane Village, Black Rock, St. Michael ( in progress)
- Bayland, St. Michael
- Lower Burney, Mapp Hill, St. Michael
- Off Spring Garden, St. Michael
- Old Chancery Lane, Christ, Church
- Sealy Land, Bank Hall, St. Michael
- Tamrind Ave to Pinders Ave, Culloden Road, St Michael
- Well House Corner, St. Philip
Highway Beautification Programme (Debushing)
- St Lucy: Crab Hill to Alexandra
- St. Peter: Mullins Road, Highway 1 to Ronald Mapp Highway Farm Road
- from its Junction with Highway 1 to Ronald Map Highway
- St. Andrew: Highway C from Lancaster via Endeavor to Hillaby
- St Thomas: Content Road, Highway E from Bibbys Lane to Airy Hill via Proute
- St John: Highway 3B from Lemon Arbour to Gall Hill
- St. Philip: Highway M from Sterling to Parish Land
- St George: Highway 4 from Salters to Drax Hall, Logan Road from Greens Logan Road to Newbury
- St. Joseph: Melvins Hill through Parks/Saddleback and Coconut Grove to Springfield
- Christ Church: Highway 6, Newton to Six Roads, Enterprise Road, Highway 7 from Rendezvous Road to the Tom Adams Roundabout
- St. Michael: River Road, Highway 6 Lower and Upper Collymore Rock and Wildey Main Road, Fontabelle, Cheapside, Chapel Street, Broad Street, Trafalgar Street, Wharf Road, Hincks Street, Princess Alice Highway and Prescod Boulevard
- St. James: Carlton Road from Highway 1 to Ronald Mapp Highway, Gibbs Road from Highway 1 to Ronald Mapp Highway

Ongoing road works
St. Michael – Excavation for the construction of slipper and kerb has started at Sargeants Village to channel the flow of water. Manhole repairs continue at the traffic lights adjoining Roebuck Street and Crumpton Street; excavation is finished and masonry work will start next. Excavation continues for a footpath at Bridge Road. Pothole patching throughout the district.
Christ Church – A grill will be installed in the bus terminal in Oistins. Masonry works on slipper and kerb continue at Seaside Drive in Atlantic Shores; resurfacing is also on the schedule. Kerb construction and resurfacing will be done in Gibbons Terrace. Repairs are scheduled to start on a headwall on Cane Vale main road. Drainage work will be done in Welches, Canevale and Oistins market. Pothole patching is scheduled for Sargeants’sVillage, Lsnds Down, Browne’s Gap, Chancery Lane, Inch Marlow, Long Beach, St. David’s, Ballantyne Development, Kingsland, Atlantic Shores, Parish Land and other districts.
St. George – Masonry work continues in Salters. Weeding will be done at Fairview, Sweet Vale and Francia Woods. Drainage ; Charles Rowe Bridge. Patching is scheduled throughout the districts.
St. Lucy – Work continues on Pie Corner Bridge; Slipper and kerb as well as headwalls are scheduled to be repaired in Josey Hill. Slab work is ongoing in Alleynedale. Well cover repairs are being carried out from Alleynedale to Archers Bay. Pothole patching will be conducted throughout districts.
St. Peter – Manhole construction is ongoing in Upper Castle. Masonry and drainage works are ongoing in Speightstown. Roadworks is oingoing for Tom Bend Road. Farm Bridge remains closed until further notice; access to the Ronald Mapp Highway from Speightstown, and vice versa, is through Warleigh Road.
St. James – Repairs are ongoing to manhole covers along Highway 1 from Porters, St. James to Mullins, St. Peter. Pothole patching is scheduled for several districts.
St. Philip – Construction of a bounce-up as well as slipper and kerb continues in Atlantic Park. The reconstruction of slipper and kerb is ongoing at Ruby Village Road and Farm Road. Manhole repairs are scheduled for Industry Hall, while manhole reinstatement is scheduled for Lucas Street. Mechanical debushing will be carried out at throughout the districts while weeding will be done in Union Development.
St. John – Weeding in Society and debushing is scheduled for Bowmanstan and Kendal. Pothole patching will be carried out in Edge Cliff Develpment, Rosegate, Sargeant Street
and throughout the parish. Masonary works will done in Edge Cliff.
St. Thomas – Construction of a connecting footpath and retaining wall continue at Stoney Gully. Debushing, drainage work and pothole patching are scheduled throughout districts.
St. Joseph/St. Andrew – Retaining wall and gabion construction as well as roadworks are ongoing at St. Elizabeth. Preparations on road paving is scheduled for Swanns. Pothole patching, drain cleaning and debushing are slated for both parishes. Persons are reminded not to drive on Swanns Bridge which has been closed due to deterioration.