NOTICES

ROAD WORKS ACTIVITIES FOR May 5 – 9, 2025

Road Marking 

The Road Marking crew of the Ministry of Transport and Works (MTW) will repaint road markings from the Deighton Griffith Secondary School to the Edwy Talma Roundabout. The crew will also remark the newly paved section of highway from the D’Arcy Scott Roundabout to the Welches Roundabout. Work will be done on Monday to Thursday, between 6:00 p.m. and 4:00 a.m., weather permitting.

Motorists are urged to avoid speeding through work areas while road markings are being done as this endangers the lives of workers and damages the freshly painted road markings.

Road Rehabilitation/ Road Construction

  • Airy Hill, St. Joseph – culvert construction
  • Babylon Road, St. Andrew – drainage & roadbase construction
  • Bruce Vale Bridge – bridge demolition completed; surveying & gabion works
  • Chance Hill, St. Lucy – kerb and culvert construction 
  • Coggins Hill, St. Andrew – stub wall, culvert & drainage construction
  • Cottage Vale, St. Philip – roller compacted concrete (RCC)
  • Eckstein Village, St. Michael –  accommodation works
  • Glenburine Road, St. John – gabion construction
  • Grant’s Gap, Westbury Road, St. Michael – milling & paving
  • Highway B2/Cherry Tree Hill, St. Andrew – drainage & gabion construction
  • Highway D: Content to Dukes, St. Thomas – road reconstruction
  • Hangman Hill to Bridgefield, St. Thomas – road reconstruction; section closed
  • Highway F Phase 1, St. John – paving & road construction
  • Huntes Road, Carrington Village, St. Michael – milling & paving
  • King’s Street, St. Andrew – gabion foundation backfilling 
  • Laynes Bridge, St. Joseph – culvert construction
  • Link Road/Four Hill, St. Peter – suckwell construction
  • Mose Bottom, St. Andrew – drainage construction
  • Park Road – 1st, 2nd, 3rd Avenues, St. Michael – concrete works, milling & paving
  • Prior Park, St. James – road reconstruction
  • Reece Road, St. Thomas – drainage construction
  • St. Margaret’s, St. John – kerb and culvert construction
  • White Hill Phase 2, St. Andrew – gabion construction
  • Wildey Triangle, St. Michael – road rehabilitation/milling & paving
  • Yearwood Road, St.  Joseph –  milling & paving

  • Drain Cleaning
  • ABC Highway going East
  • Belmont Road, St. Michael 
  • Black Rock, St. Michael
  • Canal running from Blades & Williams
  • 2nd Ave Cane Garden, St. Thomas
  • Chancery Lane, Christ Church
  • Lower Collymore Rock, St. Michael(in progress)
  • Date Tree Hill, St. Peter
  • Durants Corner, Christ Church
  • Elizabeth Park, Christ Church
  • 5th Ave Holders Hill, St. Michael
  • James Street, Bridgetown
  • Mount Standfast, St. James 
  • Paynes Bay, St.James
  • Taitt Hill, St. George
  • Tudor Street, Bridgetown 

Ongoing road works

St. Michael –Repairs to the footpathon Collymore Rock Main Road – formwork to be constructed this week. Excavation is due to start to facilitate the building of an additional 20 feet of slipper and kerb at Sargeants Village. Manhole repairs and excavation will start on the Mighty Grynner Highway. Work continues on the manhole at Crumpton Street. Repairs to commence on a manhole on River Road.  Pothole patching is scheduled throughout the parish.

Christ Church –  Repairs to the grill in 5th Ave, Crystal Crescent, Kingsland to commence.  In Welches, repairs to footpath and manhole covers on footpath. Reinstatement and drain construction continue in Gibbons Terrace. Drainage work continues in Harmoney Hall and commences in Welches. . Pothole patching is scheduled for Worthing, Warners Main Road, Kingsland, Plumgrove, St. David’s, Homestead, Silver Hill, Inch Marlow and Elizabeth Park.

St. George – Preparation for road surfacing will be carried out on Valley Main Road. Weeding continues in Rowans Park, while debushing will be done in Jericho (Market Hill). Drainage work to be done in Exchange and Constant Road.

St. Lucy – Masonary work is scheduled for Mount View. Drain cleaning will be done along Charles Duncan O’Neal Highway (Checker Hall and Bourbon). Debushing is also being carried out along the Charles Duncan O’Neal Highway.

St. Peter – Repairs continue to the slipper and kerb on Maynards Retreat Road. Farm Bridge remains closed until further notice; access to the Ronald Mapp Highway from Speightstown, and vice versa, is through Warleigh Road. 

St. James – Repairs to manhole covers continue along Highway 1 – Fitts Village to Road View while bollards will be installed at Oxnards Main Road.

St. John – Masonry works continue in Small Town and Cliff Cottage. Weeding will be carried out on Society Hill and debushing in Wakefield, Sherbourne and Guinea. Pothole patching will be carried out throughout the parish with cold mix.

St. Philip – Construction of a haunch and slipper in Atlantic Park has been completed, with general clean up work to be done. Manual weeding in Ruby Development, while mechanical debushing continues in Chapel. In Johnson Development – excavating, compacting, road widening and slipper and kerb construction will commence. Repairs to footpaths in Four Square Valley and repairs to damaged road and slipper and kerb in Cox Hill is ongoing. Cold mix pothole patching to be done throughout the district.

St. Thomas – Plastering of the retaining wall at Stoney Gully continues. Debushing, drainage work, and pothole patching are scheduled throughout districts.

St. Joseph/St. Andrew – Construction of slipper and curb at Lakes Village. The construction of a box drain and walk over continues for Bathsheba Park. Road construction is ongoing at Swanns, while slipper and kerb continues to be built at Jackmans Alley, Orange Hill. Repairs will be done to the footpaths in Belleplaine. Debushing, patching and drainage work are scheduled throughout the parishes. Persons are reminded not to drive on Swanns Bridge which has been closed due to deterioration.

Share the Post: